01  Β·  CEILING Β· PARTITION Β· FINISH
15+Years of board ceiling & partition work
GYPSUM BOARD CEILING LAHORE

Gypsum & Cement Board Works β€”
Clean Ceilings and New Walls, Without the Brick and Mess

Most interior jobs in Lahore end up needing one of two things: a better ceiling, or a wall where there wasn’t one. A flat concrete roof with a single light in the middle. An open hall that needs a separate office. A shop that needs a store room at the back. A washroom wall that keeps getting damp. For all of these, board systems on a metal frame do the job faster, lighter and cleaner than brick and plaster.

Punjab Interiors Group designs and installs gypsum board ceilings, gypsum board partitions and cement board partitions across Lahore and Punjab. Our own team handles the framework, boarding, jointing, electrical points and final paint, so the ceiling or wall you approve on the drawing is the one you get on site. This page covers the board systems in detail. For every ceiling style we offer, see our false ceiling design in Lahore page, and for glass, wooden and aluminium dividers, see partition wall design.

Galvanised Metal Framing

Rust-resistant studs, tracks and channels sized to the span and height

Right Board for the Room

Standard, moisture-resistant and fire-rated gypsum, or cement board for wet areas

Wiring Planned In

Lights, switches, sockets and AC points placed before the boards close

Seamless Finish

Taped joints, skim, sanding and paint with no visible board lines

THREE BOARD SYSTEMS, ONE TEAM

What We Install β€” and Where Each One Belongs

Gypsum and cement board look similar once painted, but they behave very differently. We pick the board on how the room is used, how much moisture it sees, and what will be fixed to it.

01

Gypsum Board Ceiling

Gypsum panels on suspended metal frame

A gypsum board ceiling is the most practical false ceiling for modern homes and offices in Lahore. Boards are screwed to a suspended galvanised grid, the joints are taped and filled, and the whole surface is painted so it reads as one smooth ceiling. It installs faster than POP, handles large spans without cracking, and makes room for cove lights, downlights and AC ducts.

  • Flat, single-level and multi-level (stepped) designs
  • Cove and profile lighting pockets
  • Recessed downlights and spot lights
  • AC duct and grille cut-outs with access panels
  • Moisture-resistant board for kitchens and laundry areas
  • Combined with POP cornices where needed
02

Gypsum Board Partition

Gypsum boards on metal stud wall

A gypsum board partition, often called a drywall, is a new wall built from metal studs with gypsum boards on both faces. It goes up in days, adds very little load to the floor, and gives a paint-ready finish that matches your existing walls. With rock wool between the studs, it gives good sound separation for bedrooms, cabins and meeting rooms.

  • Office cabins and meeting rooms
  • Bedroom and dressing area division
  • Acoustic walls with insulation
  • Wiring, sockets and data points built in
  • Backing for TVs and cabinets
  • Door frames and openings
03

Cement Board Partition

Fibre cement boards on metal frame

Cement board is built on the same light frame as drywall, but it doesn’t soften, swell or rot when it gets wet, and termites leave it alone. That makes it the right board for washrooms, kitchens, wet areas and semi-covered spaces where gypsum would fail. Its harder surface also takes tiles directly, or a paint finish with the right primer.

  • Washroom and toilet walls
  • Kitchen and utility partitions
  • Shop store rooms and back areas
  • Semi-covered and verandah walls
  • Tile-ready wall surfaces
  • Higher impact and moisture resistance
QUICK COMPARISON

Gypsum Board vs Cement Board β€” Which One Do You Need?

Most projects use both: gypsum for the dry rooms and ceilings, cement board for the wet zones. Here is how we decide.

Gypsum Board CeilingGypsum Board PartitionCement Board Partition
Best forLiving rooms, bedrooms, offices, shops, clinicsCabins, bedrooms, dressing rooms, office divisionWashrooms, kitchens, wet areas, semi-covered spaces
MoistureStandard or moisture-resistant boardDry areas onlyFully moisture and termite resistant
FinishSmooth paint finish, cove and lighting detailsPaint, wallpaper or panellingTiles, textured or primed paint finish
Sound controlReduces echo and noise from aboveGood, better with rock woolGood, denser board
Typical time3–5 days per room3–5 days per room3–5 days per room
KEY BENEFITS

Why Board Systems Beat Brick and Plaster for Interior Work

Brick still has its place in the structure. Inside a finished home or office, board systems save time, weight and mess.

01

Faster, Drier Installation

No curing time, no wet plaster, far less dust. Most rooms are framed, boarded and painted in under a week, so homes stay livable and offices lose fewer working days.

02

Light on the Structure

A board partition weighs a fraction of a brick wall, so it can go on upper floors and existing slabs without adding structural load or beams.

03

Services Hidden, Not Chased

Wires, conduits and AC ducts run inside the ceiling void or wall cavity. Our electrical wiring team fixes the points before the boards close, so there’s no chiselling or patching later.

04

Easy to Change Later

Rented office or growing family? A board partition can be removed or moved without demolition, which makes it the sensible choice for commercial tenants.

HOW IT WORKS

Our Installation Process

Six stages, one in-house team, and nothing goes up before you approve the layout.

STEP 01

Site Visit & Measurement

We measure heights and spans, check slab and floor levels, note AC and electrical positions, and look for moisture in wet zones.

STEP 02

Layout & Design

You get a ceiling or partition layout with levels, light points, doors and access panels. For bigger jobs, we can show it in 3D first.

STEP 03

Board & Frame Specification

We confirm board type and thickness, stud size, insulation and finish, then give a clear itemised quote.

STEP 04

Framework & Services

Galvanised tracks, studs and hangers go up, and wiring, conduits and backing for TVs or cabinets are fixed inside.

STEP 05

Boarding, Jointing & Paint

Boards are screwed on, joints taped and skimmed, then sanded and finished with paint or wallpaper, or tiles on cement board.

STEP 06

Check & Handover

We test lights and switches, check lines and levels, clean the site, and walk through it with you before closing the job.

WHERE WE USE THEM

Homes, Offices and Commercial Spaces Across Punjab

From our Lahore base, the same installation team works in Faisalabad, Rawalpindi, Multan, Gujranwala, Sialkot, Bahawalpur and Sargodha.

Homes & Apartments

Lounge and bedroom ceilings, dressing areas and room division as part of our residential interior design.

Offices & Corporate

Cabins, meeting rooms and ceilings with clean lighting for commercial interiors.

Clinics & Hospitals

Consultation rooms with acoustic partitions and moisture-safe cement board in wash areas.

Shops & Showrooms

Feature ceilings over display zones, trial rooms and store rooms built in days.

Restaurants & CafΓ©s

Ceilings that hide ducts and kitchen walls in cement board that handles heat and moisture.

Schools & Institutions

Classroom and office division that can be reconfigured as needs change.

WHAT WE OFFER, AND WHAT IT MEANS FOR YOU

Why Punjab Interiors Group for Gypsum & Cement Board Works

01

15+ years of board installation

Ceilings and partitions in every kind of space, from flats to campuses

02

The right board, not the cheapest

Standard, moisture-resistant, fire-rated gypsum or cement board, chosen per room

03

Ceiling, wiring and paint together

No gaps between separate contractors

04

Layout approved before work starts

You sign off levels, light points and wall positions first

05

Clear, itemised quotes

Per square foot rates confirmed before any framework goes up

06

Clean site management

Floors and furniture covered, debris cleared every day

FREE SITE VISIT

Need a new ceiling or an extra wall? We’ll measure it and quote it properly.

Design, framing, boarding, electrical points and finishing, all from one team in Lahore.

Call or WhatsApp +92 310 1777785

DHA Main Boulevard, Rafi Group, Lahore

Contact our team β†’

FREQUENTLY ASKED QUESTIONS

Gypsum & Cement Board, Explained Clearly

Answers to what clients usually ask before ceiling or partition work begins.

15+Years of ceiling and partition installation experience

More FAQs β†’

01What is the cost of gypsum board ceiling in Lahore?

Gypsum board ceilings in Lahore typically range from PKR 220 to PKR 350 per square foot, depending on the number of levels, board type and lighting integration. A plain flat ceiling sits at the lower end; multi-level designs with cove lighting sit higher. We give a full itemised quote after the site visit.

02What is the cost of gypsum and cement board partition in Lahore?

Gypsum board partitions typically run PKR 180 to PKR 280 per square foot, including metal framework, boarding on both faces, jointing and a paint-ready finish. Cement board partitions are priced close to gypsum, with the final rate depending on board thickness, wall height and whether it is finished with tiles or paint.

03Which is better: gypsum board or cement board partition?

It depends on the room. Gypsum board is better for dry indoor areas like bedrooms, offices and dressing rooms because it gives a smoother, paint-ready finish and good sound control. Cement board is better for washrooms, kitchens and semi-covered areas because moisture doesn’t damage it and it takes tiles directly.

04Can gypsum board be used in a kitchen or washroom?

Not standard gypsum. For kitchen ceilings and areas with occasional steam, we use moisture-resistant (green) gypsum board. For washroom walls, shower zones or anywhere water reaches the wall directly, cement board is the right choice.

05How long does installation take?

A standard room ceiling takes 3 to 5 days including framework, boarding, jointing and paint. A single-room gypsum or cement board partition usually takes 3 to 5 days as well. Full office fit-outs take 1 to 2 weeks depending on the total area.

06Can a gypsum partition hold a TV or cabinets?

Yes, if it’s planned for. We add extra studs or backing inside the wall at TV, shelf and cabinet positions before the boards go on, so heavy items are fixed into the frame. For built-in storage, our wood work team designs the cabinets and backing together.

Punjab Interiors Group logo

Crafting Elegant Spaces with Precision & Passion

Transforming residential and commercial spaces with modern designs, premium materials, and expert craftsmanship.

🏠

Punjab Interiors Group

🟒 Online β€” Interior Design Expert

Punjab Interiors Group Β· Contact Team