New Rooms and Cabins
Without Brick and Mess
Need an extra room, a cabin in your office, or a wall to split a large hall? A gypsum partition is the quickest way to do it. Punjab Interiors builds gypsum partition walls in Lahore on galvanised iron (GI) studs with 12.5 mm gypsum board. There is no brickwork, no curing and no week of dust.
A gypsum partition (also called a drywall or gypsum board partition) is a non-load-bearing wall: a light GI frame with boards screwed on both sides, joints taped and filled so it looks like a plastered wall. It weighs a fraction of a brick wall, which suits upper floors, apartments and plazas. For wet areas, see our cement board partition service.
GI Metal Framing
Rust-resistant tracks and studs at proper spacing
Soundproof Options
Double boards with rock wool for meeting rooms
Wiring Inside
Switches, sockets and conduits planned in
Paint-Ready Finish
Taped, filled and sanded joints
Pick the Right Wall for the Room
Every partition is built on the same GI frame. What changes is the board and what goes inside.
Standard Partition
Single board each sideThe everyday choice for office cabins, room dividers, store rooms and dressing rooms.
- Office cabins and HR rooms
- Splitting a large bedroom
- Back stores in shops
Soundproof Partition
Double board + insulationTwo boards on each side with rock wool or glass wool inside for real sound control.
- Meeting and conference rooms
- Bedrooms and studios
- Clinics and consultation rooms
Moisture & Fire-Rated
MR green board ยท FR boardSpecial boards for humid zones near kitchens, and fire-resistant board for electrical rooms and corridors.
- Areas next to kitchens
- Electrical and server rooms
- Commercial corridors
Gypsum + Glass
Half gypsum, half glassGypsum on the lower half with glass on top keeps privacy at desk level and light at eye level.
- Open-plan offices
- Manager cabins
- Clinics and labs
Gypsum Partition vs Brick Wall
Brick still has its place outside. For interior rooms, gypsum is faster and cleaner.
| Gypsum Partition | Brick Wall | |
|---|---|---|
| Build time | 2 to 4 days for most rooms | 2 to 3 weeks with plaster and curing |
| Weight on floor | Very light | Heavy |
| Mess on site | Minimal | Bricks, sand, cement, water |
| Wiring | Runs inside the wall | Needs chasing and repair |
| Change layout later | Can be removed or moved | Needs demolition |
| Best for | Interior rooms, offices, upper floors | Exterior and load-bearing walls |
Why Gypsum Partitions Work So Well
Fast, clean and flexible, which is why most Lahore offices and homes now use gypsum for interior walls.
Fast Installation
Most rooms are finished in 2 to 4 days.
Light Weight
Safe for upper floors, flats and plazas.
Clean Site
No bricks, sand or curing water.
Flexible Layout
Walls can be moved when your needs change.
Our Gypsum Partition Installation Process
Free Site Visit
We measure the space and agree the layout with you.
Marking
The wall line is marked on the floor and ceiling.
GI Framing
Floor and ceiling tracks go in, then vertical studs.
Services Inside
Conduits, switch boxes, backing and insulation are fixed.
Boarding & Jointing
Boards are screwed on, then joints taped, filled and sanded.
Handover
A paint-ready wall, or fully painted if you choose.
Homes, Offices and Commercial Spaces in Lahore
We work across DHA, Gulberg, Johar Town, Bahria Town, Model Town, Wapda Town, Lake City, Cantt and the rest of Lahore.
Offices
Cabins, meeting rooms, HR and server rooms.
Homes
Extra bedroom, study, dressing or store room.
Shops & Plazas
Back stores, trial rooms and counters.
Clinics & Labs
Consultation rooms and waiting areas.
Schools
Classrooms and admin offices.
Restaurants
Private dining sections and staff areas.
Why Punjab Interiors for Gypsum Partition
Lahore-based team
Our own installers work from DHA Main Boulevard, not outsourced labour
Clear written quote
Full scope in writing after a free site visit
Proper GI framing
Galvanised tracks, studs and channels at the right spacing
Clean, tidy site
Work areas are cleaned at the end of every day
One team for everything
Ceilings, partitions, electrical, flooring and paint together
15+ years of work
Homes, offices, clinics, shops and restaurants across Punjab
Need an extra room or cabin? We will measure it and quote it properly.
Framing, boarding, electrical points and paint, all from one team in Lahore.
DHA Main Boulevard, Rafi Group, Lahore
Gypsum Partition FAQs
Straight answers to what Lahore clients ask us most about gypsum partition.
Years of ceiling and partition work in Lahore. Still have a question? Call or WhatsApp +92 310 1777785.
01What is a gypsum partition made of?
A light galvanised iron (GI) frame with 12.5 mm gypsum boards screwed on both sides. Joints are taped and filled so it looks like a plastered wall.
02How long does a gypsum partition take to install?
A normal room or office cabin takes 2 to 4 days, including jointing. Large office floors take longer, and we give a timeline with the quote.
03Is a gypsum partition soundproof?
A standard wall cuts normal conversation noise. For meeting rooms and bedrooms, we add double boards and rock wool for much better sound control.
04Can I hang a TV or shelves on a gypsum wall?
Yes. Tell us before boarding and we add wooden or metal backing at that spot. Light items can hang on proper gypsum anchors.
05Can gypsum partitions be used in washrooms?
No. Gypsum is not made for wet areas. Use a cement board partition for washrooms, kitchens and outdoor walls.
06Will a gypsum partition crack?
Cracks usually come from poor framing or untaped joints. We use GI studs at proper spacing and tape every joint, which keeps the wall stable.